Log på Markedsindex.dk   
Opret blog   
Markedsindex.dk Markeder Butikker Debat Blogs
   Du er her: Markedsindex.dk -> Blogs -> LH -> Two Stages of Processing Mineral Separation Materials
   
yoyocrusher
 | 
Oprettet 25. December 2018 kl. 00:50
 | 
0 kommentarer
 | 
Tip en ven

Two Stages of Processing Mineral Separation Materials

The processing of Construction Waste Crusher materials includes dehydration and comprehensive recovery two main aspects. Dehydration Dehydration refers to the water off the water in concentrate. The concentrate resulting from dry mineral separation will be directly shipped to the sintering plant; while The concentrate resulting from wet mineral separation needs the dewatering treatment to the aqueous slurry, making it with water for around 9% per cent before it can be sent to the sinter plant. Dehydration process is generally divided into three steps: concentration, filtrating and drying. Dehydration is the first step of dehydration process, by which concentrate concentration can be increased to increase the filtration efficiency. Filtering is the next process of concentration, which can make the concentrate and tailings products come up to the required standard. Drying is filtered to concentrate. Comprehensive recovery There are often many other symbiotic useful elements in iron ore, such as vanadium, titanium, phosphorus, copper, rare earth elements and so on. Integrated approach to recovery and comprehensive utilization must be carried out in ore dressing process. In this way, a mine can play a role equal to several mines. The tailing coming out of ore dressing plant is known as “waste”. In recent years, with the development of science and technology, strong research and utilization has been made on these wastes at home and abroad, to achieve comprehensive utilization. Comprehensive utilization means a lot, it can make full use of mineral resources, the masters of metal, at the same time, can get rare and dispersed elements which is no separate deposits in nature, can also make use of a lot of lean ore to expand resources and reduce costs. Tailings without useful metal also can be used as construction materials.


0 kommentarer


Du skal være logget ind for at skrive en kommentar


Indtast brugernavn

*

Indtast password

*
 
Glemt dit password? Opret et login her

LH

Se mere om bloggeren yoyocrusher

I see countless mold shop inside the main problem is the "slow" this problem, from slow to slow to slow down the slow processing of the logistics, and...

Gå til bloggen LH

Læs min blog


Seneste indlæg

Til blogindlæget Analyses on Jaw Crusher Crushing Technology

Analyses on Jaw Crusher C...

China Stone Crushing Equipment is the earliest crushin...

Til blogindlæget Reform of Cement Manufacturing Line

Reform of Cement Manufact...

Just lately, realized from the cement plant in Shandong t...

Til blogindlæget The needs and development of mining machinery

The needs and development...

The needs and development of Ghana Gold Crusher in Chi...

Til blogindlæget Wear Problems of Crusher

Wear Problems of Crusher

The abrasion is inevitable for the mechanical equipment...

Til blogindlæget  Portable Crusher is the Trend of Today

Portable Crusher is the ...

Construction Waste Crusher is the trend of today. The...


Arkiv